HONGYANG GROUP Georgia Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Georgia Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U401-A Solenoid Valve

fuel-dispenser

U401-A Solenoid Valve

The flow control valve has been tested and granted Ex approval.The Ex-approval is EX m II T4.Ex certificate number is CE021037.

Materials:

Body: Die cast aluminum alloy

Technical Specifications:

Power:AC220 V,2×4W

Current Consumption: big flow valve 18mA, small flow valve 18mA

Allow flow rate:65L/min,big flow rate:50L/min,small flow rate:5L/min.

Working pressure:0.035-0.035MPa

Environmental Condition: -40~~+70degree

Features:

A high advantage in reliability and adaptability.

Housing: Die cast aluminum alloy.

Dual flow control valves have three grades of big flow, small flow and close.

The fuel resistant cable can be customized regarding length.

100% Factory Tested.

Wiring:

Color Link

Brown communal terminal

Black big flow rate

white small flow rate

Yellow/green ground

Package:

Product ID Weight Dimension

U401-A 2.1kg/case of 130 ×116× 80mm/case of 1

products links

links

technical archives

    emperature of nozzle. tj.; Stop fuel dispenser. Readout indicating valve Vj, unit price Pu, and sale vale Pj. (keep two digitals after decimal.); Readout vernier value corresponding to nadir in measuring neck as foam and bubble disappear completely. Calculate out standard cubage VB (keep two digitals after decimal.) under 20 ? Then measure oil temperature tB in the middle of the standard measurer; Empty measurer according to stipulation; Repeat Procedure 4 to 8 at least twice; Regulat flow rate to the minimum rate Qmin, as for appraisal or period appraisal after ground installation, Qmin = 0.2 Qmax. Repeat Procedure 4 to 8 at least three times; Till now ground appraisal has been finished, namely, take six groups of data at least under two kinds of flow rate and repeat it 3 times. Data processing calculating formula Calculating formula for real volume VBt in standard measurer under testing temperature tj: VBt = VB [1+βY (tj - tB) + βB (tB-20) ] (6-1) Relative volume error formula: EV = (VJ –VBt) / VBt ×100% (6-2) Measure repeatability formula: En = EVmax ?Evmin (6-3) Flow rate calculating formula: Qv = 60Vj / t (6-4) Due money formula: PC = Vj · Pu (6-5) Due money error formula: EP = Pj -Pc (6-6) I fuel dispenser n above six formulae: VBt──real volume valve (L) under in measurer; VB──standard cubage of measurer under 20; βY , βB──volume expansion coefficient of appraisal media oil and measurer, respectively, (ga fuel dispenser soline: 12×10-4/? kerosene: 9×10-4/? light diesel oil :9×10-4/? stainless steel:50×10-6/? carbonized steel:33×10-6/? brass , bronze: 53×10-6/? tj , tB──oil temperatures in flow meter (or nozzle outlet)and standard measurer VJ── cubage value (L) under tj?temperature EV── relative cubage error (%) n ── measuring times fuel dispenser

technical specification

    APPLICATION   Page: 10   PRICE POLE STATE DIAGRAM   (ERROR CONDITIONS)   INOPERATIVE   1   MAJOR ERROR MINOR ERROR   IDLE   2   MAJOR ERROR   MINOR ERROR   Figure 2  June 2005 IFSF - STANDARD FORECOURT PROTOCOL FP32_114   PRICE POLE APPLICATION   Page: 11  FIGURE 3 PRICE POLE STATE TABLE   State 1 2   INOPERATIVE IDLE   Event   Operative - 2 -   Unable 1 - 1   Major-error 1 - 1   Minor-error 1 2  Description  n no state change  - n State changes to state fuel dispenser n   not applicable  FP32_114 IFSF - STANRD FORECOURT PROTOCOL Jume 2005   PRICE POLE APPLICATION   Page: 12  2.2 Stat fuel dispenser e Event Description  2.2.1 State INOPERATIVE 1   STATE DESCRIPTION   INOPERATIVE The PP is in the INOPERATIVE state when it is not possible to function. The   reason for this is that essential operational data is missing or a fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    t that Mr Blair was apologetic. He described how, during his decade in Downing Street, the challenges facing government had shifted from the essentially domestic—managing the economy, rebuilding neglected public services and fighting poverty—to more threatening and intractable global concerns. Those include not just terrorism but mass immigration, looming energy shortages and climate change. Above all, he wanted to remind his party how it had won three successive elections and could win a fourth by an unceasing focus on people s hopes and fears. “The core vote of this party today? he said, “is not the heartlands, the inner city, not any sectional interest or lobby. Our core vote is the country.? New Labour, he boasted, had created a coalition by reconciling compassion with aspiration. Now the task was to reconcile liberty with security. The only legacy that had ever mattered to him, insisted Mr Blair, was winning a fourth election victory. If Mr Blair thinks he knows how Labour can win a fourth term, he is a good deal less certain about who is capable of delivering it. In a concerted effort to patch things up following the recent unrest, Mr Blair and Gordon Brown each paid public tribute to the other this week, while acknowledging how fraught their relationship has often been. According to Mr Blair, Gordon was a remarkable man without whom those three election victories could not have been won. Left unsaid w fuel dispenser as whether, on his own, Mr Brown could win a fourth. The chancellor was more lavish in his praise, perhaps too much so. The unintended news story of the conference was Cherie Blair s outburst while watching fuel dispenser Mr Brown s speech on a monitor outside the hall. When the chancellor claimed that working for Mr Blair had been “a privilege? Mrs Blair reportedly exclaimed, “Well, that s a lie.?She later denied having made the remark. But with the best joke of the conference, Mr Blair made no pretence about her feelings towards the chancellor, saying that at least he didn fuel dispenser